I am sad to announce that while my laptop was repaired ALL of the data was lost.
Beyond discouraged.
There will probably be no post this Friday as life is kicking me so hard in the teeth I need spiritual dentures.
I keep telling myself that this is a set-back and not a catastrophe but with the number of other things going wrong in my life right now, it's so difficult to believe.
But expect something up for Monday, at least.
No comments:
Post a Comment